Northeastern University Mugar and Hurtig Hall Renovation
Northeastern University, Boston, MA, View Picture.
Jung / Brannen Architects
Boston, MA
Structural design and observation during construction for the renovation two buildings for conversion to new laboratory space.
Feasibility Study, structural design, preparation structural drawings, specifications and observation during construction.
Brandeis University Foster Mod Buildings, Mechanical Renovation
Brandies University, Waltham, MA, View Picture.
L/R Construction
Framingham, MAStructural design and observation during construction for new pad and enclosure structures to house new mechanical equipment.
Structural design, preparation structural drawings, specifications and observation during construction.
Tufts University, Lincoln Filene Building Renovation
Tufts University, Medford, MA, View Picture.
L/R Construction
Framingham, MAStructural design and observation during construction for creation of new openings in an existing exterior foundation wall.
Strength evaluation, structural design, preparation structural drawings, specifications and observation during construction.
Brown University, J.Walter Wilson Laboratory
Providence, Rhode Island
William Wilson Architects, Vanderweil Engineers
Structural design for Architectural and Mechanical Renovations. Installation of
a new mechanical dunnage for the support of new exhaust fans. Repair of
cracked roof slab and cracked column at the roof by steel jacketing.
Structural design, preparation of structural drawings, specifications, and
observation during construction.
Boston University, Renovation of Bakst Auditorium
80 East Concord Street, Boston, MA
Cannon, Architects
Renovation of Existing Auditorium and office area, including removal
of the rear wall at the Auditorium.
Boston University Cantor/Smith Laboratory, Boston, MA
Cannon, Architects
Cosentini Associates, Consulting Mechanical Engineers
Installation of new Mechanical Penthouse on the existing roof.
Boston University Medical Campus, Dental School Renovations
The Stubbins Associates, Inc. Architects
Structural Design, Observation during construction.
Charles F. Hurley Building, Boston, MA
Northeast Energy Consulting Engineers, Framingham, MA
Replacement of chiller/heaters, Installation of mechanical units.
Tufts University M&V-Stearns Buildings, Downtown Campus, Boston, MA
Payette Associates Inc., Architects/Planners
SAR Mechanical Engineers
Structural Design for Mechanical Renovations
Berkshire Medical Center, Pittsfield, MA
Payette Associates, Inc., Architects/Planners
BR+A, Mechanical & Electrical Engineers
Structural Design for Mechanical Renovations
Tufts University, Pearson Chemistry Building, Medford, MA
Tufts University Construction Department
Structural Design for Mechanical Renovations
Bank of Boston, Columbia Park, Boston, MA
Sasaki Associates Inc., Architects, S.B.
Sager & Associates, Electrical Engineers
Installation of new mechanical units on existing dunnage
on Building “E”.
New England Telephone Office Building, 185 Franklin St., Boston, MA
Shooshanian Engineering Associates
Structural Design for Mechanical Renovations
Massachusetts Department of Public Health, State Laboratory Institute
305 South St., Jamaica Plain, Boston, MA
Mechanical and Structural Renovations.
CGT, Framingham, MA, Installation of Water Tanks
Shooshanian Engineering Associates